The Department of Environment (DOE) Malaysia is reviewing an Environmental Impact Assessment (EIA) for Project
LAPORAN PENILAIAN KESAN KEPADA ALAM SEKELILING (EIA) BAGI CADANGAN “THE CONSTRUCTION OF TRANSMISSION LINE AND DEVELOPMENT OF A HYBRID HYDRO-FLOATING SOLAR PHOTOVOLTAIC (HHFS) PROJECT WITHIN TEMBAT FOREST IN KENYIR RESERVOIR FOR TNB POWER GENERATION SDN BHD
The public are welcome to submit written comments on the EIA Report during the public display period.
This EIA report will be displayed from 19 Disember 2025 to 18 Januari 2026 with public comments accepted until 2 Februari 2026. This EIA Report is also available for viewing at selected locations or can be referred as below:
More information;
EIA Secretariat, Evaluation Division
Department of Environment Malaysia