Skip to content

Leave a Reply Cancel reply

You must be logged in to post a comment.

Recent Posts

  • Proposed Iron Ore Mining Operation On Lot 60875 (ML 11/2022), An Area of 41.80 HA, Locality of Kampung Machang Setahun, Mukim Tebak, District of Kemaman, Terengganu Darul Iman.” oleh Kurnia Sempurna Sdn. Bhd.
  • Environmental Impact Assessment For Proposed Waste Recovery Facility On Lot 2017, Jalan PBR 14, Kawasan Perindustrian Bukit Rambai, Peringkat IV A, Mukim Tanjong Minyak, Daerah Melaka Tengah, Melaka Untuk Seraphim Renewable Sdn. Bhd.
  • Environmental Impact Assessment (EIA) Bagi Cadangan Membina Kilang Penapis Minyak Berkapasiti 1.2 Juta Tan Setahun Di Atas PT28711, Mukim Sungai Karang, Daerah Kuantan, Pahang Darul Makmur
  • Environmental Impact Assessment (EIA) Bagi Proposed Iron Ore Mining Operation At Lot 112995 And 112996 Covering 80.85 Hectares (200 Acres) At Bukit Besi Area, Mukim of Jerangau, District of Dungun, Terengganu Darul Iman
  • Approval Of The Environmental Quality (Amendment) Bill 1974

Recent Comments

    X
    Department Of Environment
    Welcome to WPBot
    × qcwpbotmodal-content
    Skip to content
    Open toolbar Accessibility Tools

    Accessibility Tools

    • Increase TextIncrease Text
    • Decrease TextDecrease Text
    • GrayscaleGrayscale
    • High ContrastHigh Contrast
    • Negative ContrastNegative Contrast
    • Light BackgroundLight Background
    • Links UnderlineLinks Underline
    • Readable FontReadable Font
    • Reset Reset