Skip to content

Leave a Reply Cancel reply

You must be logged in to post a comment.

Recent Posts

  • The Proposed Mining Operations of A Rare Earth Elements (REE) Extraction Project From Ion Adsorption Clay (IAC) Deposits Within A 180-Hectares Area At PT3730, Kawasan Khas, Bandar Dato’ Bentara, Panggong Lalat, Mukim Batu Papan, Galas District, Gua Musang, Kelantan Darul Naim oleh Sunrise Ecotech Sdn. Bhd.
  • Disclaimer Regarding Supplier Appointment Letter
  • Proposed Development of Phase 2 Waste-To-Energy (WTE) Power Plant At Tapak Pelupusan Sisa Pepejal Bersepadu Ladang Tanah Merah (TPSPB LTM) Mukim Jimah, Daerah Port Dickson, Negeri Sembilan
  • Laporan Penilaian Kesan Kepada Alam Sekeliling (EIA) Jadual Kedua Bagi Projek “Proposed Extension of Secure Landfill at The Kuching Integrated Waste Management Park (KIWMP), Mambong, Kuching, Sarawak” Tetuan Sarawak Waste Management Sdn Bhd
  • Laporan Penilaian Kesan Kepada Alam Sekeliling (Environmental Impact Assessment) Jadual Kedua Bagi Proposed Aluminium Smelting Plant in Existing Non-Ferrous Alloy (Metallurgical Grade Silicon) Smelting Plant at Lot 322, Block 1, Kemena Land District, Samalaju Industrial Park, Bintulu, Sarawak by PMB Silicon Sdn. Bhd.

Recent Comments

    X
    Department Of Environment
    Welcome to WPBot
    × qcwpbotmodal-content
    Skip to content
    Open toolbar Accessibility Tools

    Accessibility Tools

    • Increase TextIncrease Text
    • Decrease TextDecrease Text
    • GreyscaleGreyscale
    • High ContrastHigh Contrast
    • Negative ContrastNegative Contrast
    • Light BackgroundLight Background
    • Links UnderlineLinks Underline
    • Readable FontReadable Font
    • Reset Reset